On 24th , April, 2019. Our cooperated customer from Nigeria come to our office for discussing long term cooperation of the Armor plates and Mobile house with each other.In BBN office, we have proceed briefly introduction of each other , and discussed all
Our Nigeria customer which including more than 8 subsidiaries. The company is one of the biggest contractor that is professional in oil and gas project and always cooperate with Nigeria government. And they almost repeat order around 2000 tons quantity mo
In 30th,Dec,2018-2th,Jan,2019, One Malaysian customer come to visit our factory to inspect their goods about CCS-AH36 steel plate.1. We bring our customer to ou
In December, One Indian customer come to visit us to negotiate 45# Hexagonal bar and round bar order for their hydraulic power plant project .As you known , MAN
It is pleasant to share our new relationship with one of the new customer from India. They visit our office, talked about the SA387Gr11CL1 steel plate order. Th
In September, One Indian customer come to visit us to negotiate 3500 tons steel strips order for their ERW pipe producing work .
In Sep.2017,our Myanmar customer came to BBN for discussing this order.Because they need 4,5 and 6mm thickness steel plate,in order to saving cost. We recommended them accept plate cut from coil. And we also took them to visit our 2250 mm steel coil produ
In 2013,Our client visit our company. We brought them to visit our 2250mm hot rolled coil production line, all the equipment was advanced brand SMS imported from German
During the supplier selection stage in 2016, the project leaders from Venezuela visited China for several candidates. After visiting our company bebon and facto
With the fast development in Myanmar, Myanmar navy build frigate every year. Bebon Cooperate with Myanmar Navy from from 2015. In May,2018, the Myanmar navy'
In December,2016, the customer from UAE come to China visit us. They are ready to purchase 16Mo3 steel plate to build the hospital helicopter platform in UAE. A
Our Uzbekistan customer visit us on July,2018.They came to China to find a new supplier for 34CrMo4 seamless pipe, mainly used in automobile gas cylinder instal
In MAY,2018.Our philiphines customer(D.M.CONSUNJI,INC) contacted us online, and would like to purchase Q345B seamless pipe in stock for building family chapel.
In June 30, 2018, our Malaysian customer (our customer) come to our company. This company is a manufacturer on boat in Malaysia, which they need the material ar
In last week, One Indian customer come to visit us to negotiate 3500 tons steel
strips order for their ERW pipe producing work .
As you known ,our customer
In July,2018 , the purchase manager and top boss from our customers company visited our company BEBON to discuss 1060 Aluminum coil purchase and inspection issu
This customer mainly supply the products and services for all the equipment needs of Oil & Gas sector, Power sector, fertilizer sector and other process industr
In April,2018, our Malaysia customer(our customer) come to BEBON for discussing their feedback for the 304 plate based on last project.They specializes in the d
In March of 2018, this Pakistan customer visiting BEBON to discuss one Q345R pressure vessel steel plates.
This customer is one reputable Construction Company in Pakistan, which specialized in the fields of civil engineering and associated electrical w
In Feb,2017, our Bangladesh customer(our customer) come to BEBON for discussing long time cooperation of API5LGRB Steel coil with each other.
We have just finished with one seamless pipe order (Material E355+N ) for our regular client from our customer in India . The head office of our customer in
Ka
our customer which is most big Motorcycle factory in Columbia ,And our customer is Japan Honda's only distributor in Colombia,they have visit our company i
As you know , There is no metro in Qatar before October , 2016 . The Qatar Railways company launched a tender for designing ,construction and completion of Gree
Latest Products
Henan BEBON Iron&Steel co.,ltd.