EN10025-5 S355J0WP Weather Resistant Steel Coil

EN10025-5 S355J0WP Weather Resistant Steel Coil Chemical Composition and Mechanical Property
| 
             C max  | 
            
             Si max  | 
            Mn | P | 
             S max  | 
            
             N max  | 
            Addition of Nitrogen combining elements | Cr | Cu | 
| 
             0.12  | 
            
             0.75  | 
            0.10 max | 0.06-0.15 | 
             0.035  | 
            
             0.009  | 
            - | 0.30-0.1.25 | 0.25-0.55 | 
| 
             Yield Strength (MPa) min.  | 
            
             Tensile Strength (MPa)  | 
            
             Elongation % min.  | 
        |||||
| 
             Thickness(mm)  | 
            
             Thickness(mm)  | 
            
             Thickness(mm)  | 
        |||||
| 
             t≤16  | 
            
             16<t≤25.4  | 
            
             t<3  | 
            
             3≤t≤25.4  | 
            
             1.5<t≤2.0  | 
            
             2.0<t≤2.5  | 
            
             2.5<t<t3.0  | 
            
             3≤t≤25.4  | 
        
| 
             355  | 
            345 | 
             510-680  | 
            470-630 | 16 | 17 | 18 | 22 | 
EN10025-5 S355J0WP Weather Resistant Steel Coil Application
 EN10025-5 S355J0WP weather resistant steel coil has wide applications such as Vehicle, Bridge, Tower and Containers.          
    EN10025-5 S355J0WP Weather Resistant Steel Coil Other Name
 EN10025-5 S355J0WP weather resistant steel, EN10025-5 S355J0WP weather resistant steel coil         
    Additional Condition
  UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
       
    Other Terms
Packaging Details: Standard export seaworthy packing or as required.
Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
    Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
Sales Department Team
                Send Order Request Online Chat
          
          


