2300 ton API 5L GrB ERW pipe supplied to Polyard Petroleum in Philippines

Bebon supplied 2300 ton API 5L GrB ERW pipe to Polyard Petroleum company in 2016. It takes 35 days for Bebon to finish all the production according to API 5L standard. The products are used to drilling , gas transmission works.  
1. API5L PSL1 GR B original Mill Test Certificate
 
API 5L Gr.B ERW pipe MTC
2. API5L PSL1 GR B PIPES PICTURE
 
API 5L Gr.B ERW pipe
3. THE DIMENSION TEST
4.jpg
4. The material, heat number, supplier name and size will be shown on the surface of steel pipe.
API 5L Gr.B ERW pipe
5.  The package AND TRANSPORTATION
API 5L Gr.B ERW pipe
6. THE Container Picture:
API 5L Gr.B ERW pipe
7. Bill of Loading:
API 5L Gr.B ERW pipe
 
 
 

Contact Us

Henan BEBON Iron&Steel co.,ltd.

Send Order Request

Henan BEBON Iron&Steel co.,ltd.